System słupowy z rozporą rolkową SRR

Slide rail system with rolling strut is the leading system suitable for works over 4 m of depth and excavation width over 3.5 m. The system allows maximum clearance under the strut for large diameter pipes.

 


Informations:

Excavation depth – up to 6.20 m
Excavation width – 1.24 - 7 m
Excavator 24 - 31 t

Contact:

Trench Shoring Systems EAST:

mgr@stalrent.eu

+48 608 619 305

 

Trench Shoring Systems WEST:

mci@stalrent.eu

+48 600 036 303

 

Trench Shoring Systems SOUTH:

kpy@stalrent.eu

+48 608 492 192

contact

STALRENT © 2021 01studio.eu